Capital Improvements

High School Gym Renovation

As part of a proposition approved by residents in October 2024, the Red Hook High School gymnasium underwent a complete renovation in summer 2025 and into the fall. The floor and bleachers, original to the school’s 1963 opening, were to be replaced to improve the safety and accessibility of the space. The knee wall, part of a stage that was closed off following the opening of the Performing Arts Center, was removed and the space is to be used for more bleachers. The bleachers are scheduled to be installed in October.

An empty basketball court with a polished wooden floor and red accents.

June 25

Construction site with partially built walls and the word 'RED' on the floor.

June 25

An empty room with gray walls and a concrete floor.

July 15

An empty warehouse space with concrete floors and high ceilings.

July 15

A gymnasium floor is being renovated, with exposed wood and construction materials.

July 31

An empty gymnasium with a wooden floor and basketball hoops.

July 31

A gymnasium floor is being renovated, with sections of the old floor removed.

August 5

An empty room with a light-colored wooden floor and unfinished walls.

August 5

An empty gym with a smooth, white surface.

August 12

An empty indoor space with a light-colored floor and gray walls.

August 12

An empty basketball court with wooden flooring and painted lines.

September 3

An empty gymnasium with basketball hoops and a wooden floor.

September 5

An empty gymnasium with basketball hoops and a wooden floor.

September 5

An empty gymnasium with basketball hoops and a wooden floor.

September 5